Donations through the Decades-The East Lyme Public Trust Foundation- The Boardwalk Monument- over $17,000 in donations

In December 17, 1999, the Voters of East Lyme approved a town-wide Referendum to build the Boardwalk.  Then, in February, 2002, the EL Selectmen established an Overlook Design Committee to advise the EL Building Commission.

The Design Committee decided to commemorate the many people who had worked to make the Boardwalk a reality by erecting a Monument with dedication plaques.  The Design Committee desired that future generations would know the many people who had given so generously of their time and energy. 

At the time the Monument was erected in 2005, its estimated cost was­­­ $4.000.  In addition in 2005, one of the plaques had to be corrected for an expenditure of $1,700.

One of the original plaques commemorates the Dedication of the Boardwalk on July 15, 2005. This plaque, which lists the names of the Design Committee, the Building Committee, the Design firm and the Construction firm, also informs that the Boardwalk was completed during the terms of First Selectmen Dave Cini and Wayne Fraser.

The second original plaque lists the Chairpersons from 1994-2005, the Dedicated Volunteers, and The Donors of Boardwalk Property.

Shortly after the Ribbon Cutting for the Niantic Bay Overlook on July 15, 2005, both the Town and the Foundation dedication bronze plaques, mounted on the monument at The Hole-In-The-Wall, were defaced by vandals. Those responsible were suspected but were never apprehended.  In June of 2007, it was necessary to restore the two vandalized dedication bronze plaques for $950.

In 2014, after the storms that had devastated the west end of the Boardwalk, the Monument, which was on the water side, was severely damaged.  In 2015, the Foundation then contracted with The Lou Nassetta Co.  to construct a new monument on the north side of the reconstructed Boardwalk, 60 ft. east of the underpass at the entrance at Hole in the Wall. Bill Sheer, the Town Engineer at the time, conceived the location and placement of the new monument. The Nasetta company would also install three bronze plaques which were to be recessed into the monument.  The cost of these services was $4,675. 

In addition, Cavalier Conservation Sculpture was hired to refurbish two of the original plaques and produce one new plaque for a combined cost of $1,950.  The new plaque commemorates the Rededication in 2015 and the Reconstruction during 2005-2015.  This reconstruction took place during the terms of the Selectpersons-Beth A. Hogan, Paul Formica, and Mark Nickerson.  It also acknowledges the Eastern Project Team, the Western Project Team and the East Lyme Public Trust Foundation which conceived and implemented the Boardwalk from 1993-2003.

In 2020, the Foundation voted approximately $4,000 to repair the damage to the original two plaques that had occurred from the elements to which they had been exposed. These repairs are now being arranged.

These plaques give credit to the many individuals responsible for key aspects of the project.  They represent engineers, attorneys, masons, craftsmen, volunteers, donors, and elected officials.  This monument is a reminder of what can be achieved through cooperation between public and private organizations.

We appreciate your comments.  Be sure to follow us on Facebook, we are approaching 460 followers!  Also, go to our website for further information: http://publictrustfoundation.org/

2005-estimated original cost                                                                     $4,000

2005-Correct/re-make East Lyme’s Dedication Bronze Plaque            $1,700

2007- Restore Vandalized Plaques                                                             $   950

2015-Rebuild monument and install plaques                                          $4,675

2015- Refurbish two original plaques and produce new plaque          $1,950

2020-Foundation votes to refurbish the plaques damaged by               $4,000                                                                                      TOTAL                         $17.275

Original monument photo

Previous
Previous

Volunteers Who Make A Difference

Next
Next

The East Lyme Public Trust Foundation and Dave Putnam, one of East Lyme’s Favorite Sons